These are houses worth looking after, and the owners generally do. What nobody plans for is that a panel installed in a hall closet in 1968 becomes a relocation job the moment it needs replacing, because the code has changed around it.
Where are the panels in College Hill houses?
In places nobody would choose today. Bedroom and hall closets, under stairs, in pantries, behind doors that open against them. All of those were acceptable when they were installed, and none of them provides the clear working space in front of a board that current code requires.
A board already in one of those positions is generally permitted to remain there. Replace the board and it has to move, which means new feeder routing, making good, and a larger job than the homeowner expected. We measure the clearance during the assessment so this is priced rather than discovered.
Panel work we carry out most here
- Panel relocation out of closets and stairwells during a replacement
- 60 and 100 amp services in houses that have added air conditioning
- Fuse services still carrying part of the house
- Grounding electrode systems that were never installed to a modern standard
- Subpanels added for kitchen and attic renovations
Why does grounding come up so often in these houses?
Because a house built in 1912 was never given a grounding electrode system in the form the code now expects. Later upgrades often bonded to whatever was convenient, frequently a metal water pipe that has since been partly replaced with plastic, which quietly breaks the path.
On a panel replacement the grounding and bonding at the service have to be brought to the 2023 NEC. In a house this age that is real work rather than a formality, and it is one of the reasons a College Hill quote sits above the same job on the west side.
Arrival and permits
About twenty-five minutes from the yard, with same-day slots held for panels that are warm, humming or smell burnt. College Hill is inside the City of Wichita, so MABCD permits the work from 271 W 3rd St N, Suite 101 on (316) 660-1840, inspected against the 2023 National Electrical Code, enforced here since January 1, 2025.